Environmental Review Begins for West Los Angeles Civic Center Redevelopment

The West LA Commons set to bring 926 units of housing and 36,569 square feet of retail to Santa Monica Boulevard

By Dolores Quintana

The redevelopment of the West Los Angeles Civic Center would bring 926 units of housing and 36,569 square feet of retail to Santa Monica Boulevard. 

Abode Communities and AvalonBay Communities were chosen a year and a half ago to revamp the West Los Angeles Civic Center as reported by Urbanize Los Angeles. Next up for the project is one of the most difficult parts of the entire process namely California Environmental Quality Act (CEQA) review. 

The Los Angeles County Department of Regional Planning’s report states that the West L.A. Commons project would include 1.1 million square feet of new structures and development over the nine-acre site that is surrounded by Santa Monica, Iowa Avenue, Corinth Avenue, and Butler Avenue.

The plans already submitted show that the development would have nine new buildings that would include the following:

  • 926 residential units (including 495 market-rate and 431 income-restricted units)
  • 36,569 square feet of neighborhood-serving retail and restaurant uses
  • 76,341 square feet of municipal offices, and
  • a 23,868-square-foot replacement facility for the Felicia Mahood Multipurpose Center.

The development’s plans include over 100,000 square feet of open space that would be available to the public on this campus. This represents double the amount of space that is currently available and parking for more than 1,500 vehicles.

Koning Eizsenberg, Olin and AC Martin are the design team and they have planned for contemporary low rise structures that would vary between two stories and eight stories. The development would be built around a series of interior paseos and courtyards.

However, not all of the buildings that are currently part of the property would be demolished. The public library, a police station, and bandstand would remain as part of the Commons. The decommissioned West LA Courthouse onsite will be renovated and made into an arts pavilion that has a mixed use of housing and commercial space. 

It is estimated that full construction of this project will take until 2028 to complete and would begin in 2024, depending on approvals and financing.

in News
Related Posts

Second Victim Killed Alongside LAPD Sergeant in Brentwood 405 Crash Identified

July 1, 2025

July 1, 2025

Authorities Confirm Garcia, 34, Died at the Scene, GoFundMe Launched  Authorities have identified the civilian who was killed alongside a...

Why Nordstrom Says It’s Closing Its Santa Monica Place Location

July 1, 2025

July 1, 2025

A Nordstrom spokesperson explained the closure as a strategic realignment Nordstrom confirmed its decision to close its Santa Monica store...

People are Using Palisades for “Disaster Tours.” Local Officials Are Trying to Stop Them

June 30, 2025

June 30, 2025

A new motion introduced to City Council requests a coordinated strategy from LADOT, the Los Angeles Police Department, and the...

LAUSD Approves $604 Million Plan to Rebuild Fire-Damaged Palisades Schools

June 30, 2025

June 30, 2025

The reconstruction, set to conclude by the end of 2028, aims to restore facilities for approximately 3,620 students across the...

Free Virtual Planetarium Shows Coming to SMC in July

June 30, 2025

June 30, 2025

The virtual format is in place as construction of the new SMC Planetarium and Observatory nears completion The Santa Monica...

Six-Bed Mar Vista Hilltop Home Under Construction Lists for $5.3M

June 30, 2025

June 30, 2025

The private backyard is complete with a pool, spa, fire pit, built-in BBQ, and areas for outdoor dining A stunning...

(Video) Getty Villa Reopens Six Months After Dodging Destruction of Palisades Wildfires

June 29, 2025

June 29, 2025

With the reopening also comes a new exhibit, “The Kingdom of Pylos” Getty Villa Reopens Six Months After Dodging Destruction...

Three-Bed Palisades Highlands Townhouse Hits Market for $1.7M

June 29, 2025

June 29, 2025

The Mediterranean-style property, located at 1529 Michael Lane, is part of a 71-unit community A remodeled 1,919-square-foot townhouse in the...

LAPD Updates Immigration FAQ to Clarify Enforcement Role

June 28, 2025

June 28, 2025

The document, available in English and Spanish, outlines the department’s policies and limits regarding immigration status The Los Angeles Police...

Three Santa Monica College Student Films Selected for International Film Festival

June 28, 2025

June 28, 2025

The LA Shorts International Film Festival, the city’s longest-running shorts festival, screens over 350 films annually and draws 10,000 attendees...

Washington Square Pizza Opens to the Public

June 28, 2025

June 28, 2025

New York Style Pizza “By-The-Slice” Now at the Beach By Nick Antonicello  Washington Square Pizza formally opened its doors today...

Park: “Our Water Infrastructure Must Be Emergency-Ready Every Day”

June 27, 2025

June 27, 2025

Councilwoman expressed cautious relief at the news but emphasized the need for robust infrastructure The Los Angeles Department of Water...

California Allocates $5B for Road Repairs, Transit Expansion

June 27, 2025

June 27, 2025

The funding aims to improve road safety, reduce traffic congestion, and promote cleaner transportation California is investing nearly $5 billion...

THIS SUNDAY: Palisades Symphony Presents “Best of Broadway”

June 27, 2025

June 27, 2025

The performance will feature a full orchestra playing iconic selections, from John Philip Sousa’s *El Capitan* and George Gershwin’s *The...

(Video) Welcome to the Urban Jungle — where nature meets the city and style meets soul

June 27, 2025

June 27, 2025

Whether you’re chasing that gritty city energy or carving out a green oasis in your space, we’re here to help...