Environmental Review Begins for West Los Angeles Civic Center Redevelopment

The West LA Commons set to bring 926 units of housing and 36,569 square feet of retail to Santa Monica Boulevard

By Dolores Quintana

The redevelopment of the West Los Angeles Civic Center would bring 926 units of housing and 36,569 square feet of retail to Santa Monica Boulevard. 

Abode Communities and AvalonBay Communities were chosen a year and a half ago to revamp the West Los Angeles Civic Center as reported by Urbanize Los Angeles. Next up for the project is one of the most difficult parts of the entire process namely California Environmental Quality Act (CEQA) review. 

The Los Angeles County Department of Regional Planning’s report states that the West L.A. Commons project would include 1.1 million square feet of new structures and development over the nine-acre site that is surrounded by Santa Monica, Iowa Avenue, Corinth Avenue, and Butler Avenue.

The plans already submitted show that the development would have nine new buildings that would include the following:

  • 926 residential units (including 495 market-rate and 431 income-restricted units)
  • 36,569 square feet of neighborhood-serving retail and restaurant uses
  • 76,341 square feet of municipal offices, and
  • a 23,868-square-foot replacement facility for the Felicia Mahood Multipurpose Center.

The development’s plans include over 100,000 square feet of open space that would be available to the public on this campus. This represents double the amount of space that is currently available and parking for more than 1,500 vehicles.

Koning Eizsenberg, Olin and AC Martin are the design team and they have planned for contemporary low rise structures that would vary between two stories and eight stories. The development would be built around a series of interior paseos and courtyards.

However, not all of the buildings that are currently part of the property would be demolished. The public library, a police station, and bandstand would remain as part of the Commons. The decommissioned West LA Courthouse onsite will be renovated and made into an arts pavilion that has a mixed use of housing and commercial space. 

It is estimated that full construction of this project will take until 2028 to complete and would begin in 2024, depending on approvals and financing.

in News
Related Posts

SMC Symphony to Perform Bernstein, Gershwin, and Beethoven

April 29, 2025

April 29, 2025

The concert will showcase musical styles, from Broadway-inspired rhythms to the traditional drama The Santa Monica College Symphony Orchestra will...

A vocal flower blooms in Beverly Canon Gardens

April 29, 2025

April 29, 2025

Soprano Golda Zahra comes home to put on a free concert in her old neighborhood “Pa-pa-pa-pa-pa-pa…” The young couple was...

Kids Learn Season of Science, Biomimicry in Heal the Bay Science Camp

April 28, 2025

April 28, 2025

This summer, kids have the opportunity to engage in science in Heal the Bay’s Aquarium Summer Science Camp.  Heal the...

Chamber Music Palisades to Present Premiere and Classical Works at April Concert

April 28, 2025

April 28, 2025

The performance will feature compositions by French composers Jacques Ibert, Maurice Ravel, Camille Saint-Saëns, and Francis Poulenc, alongside the world...

Palisades Will Rogers 5K Moves to Venice Beach After Fire Damage

April 28, 2025

April 28, 2025

Proceeds from this year’s race will help fund the rebuilding of the community center, a longstanding gathering place for local...

Newly-Built Ocean Front Walk Home Lists for Nearly $14M

April 28, 2025

April 28, 2025

A 300-square-foot space on the ground level is zoned for potential commercial use A newly constructed beachfront home along Venice’s...

Open Alcohol Consumption on 3rd Street Promenade Could be Allowed by Summer

April 28, 2025

April 28, 2025

The entertainment zone plan builds on a bill signed by Gov. Newsom, which allows public drinking areas Santa Monica officials...

Performing Arts Workshops Summer Camp Open for Registration

April 28, 2025

April 28, 2025

Performing Arts Workshops (PAW) has something for everyone this summer. They offer four two-week musical theater camps and eight one-week...

Spring Brewery Artwalk & Open Art Studios

April 28, 2025

April 28, 2025

Where Art Lives. If you’re looking for something fun and different to do, the Brewery Artwalk is holding its Spring...

Hacienda-Style Palisades Home Sells for $12M After Wildfires

April 27, 2025

April 27, 2025

The home and its immediate surroundings remained virtually untouched by the fires A modern hacienda-style home in Pacific Palisades has...

Reopening Set for Monday After Malibu Mudslide on PCH

April 27, 2025

April 27, 2025

Mudslides triggered by early morning rain showers forced the closure over the weekend Crews are making “good progress” clearing mudslides...

THIS WEEKEND: Art and Music Festival Takes Over Third Street Promenade

April 25, 2025

April 25, 2025

Admission is free and open to the public The Third Street Promenade will transform into a lively celebration of creativity...

SMC to Host Free Children’s Concert in May

April 25, 2025

April 25, 2025

The event will feature collaborative performances with local artists, including a Taiko drumming group from Culver City’s El Marino Language...

(Video) The Willows: 30 Years Going Strong

April 25, 2025

April 25, 2025

Founded in 1994, The Willows Community School, located in Culver City, California, is a Developmental Kindergarten through 8th grade non-profit, co-educational...

ASTEME Camps Explore Science, Technology, Math and Engineering

April 25, 2025

April 25, 2025

Many teachers and parents hear this question daily when it comes to schooling: “When am I ever going to use...